Тема: DIALux evo
Показать сообщение отдельно
Старый 21.08.2017, 12:16   #375
alkrymov
Высший разум
 
Аватар для alkrymov
 
Регистрация: 06.03.2009
Адрес: Москва
Сообщений: 1,312
Вес репутации: 683
alkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant futurealkrymov has a brilliant future
По умолчанию Re: DIALux evo

Вышел DIALux 7.1

Dear DIALux user,

We released a new DIALux evo version 7.1. We wish you lots of fun and success in your lighting planning!

In the following you find an overview of the new features and the improvements in this version:

Installation:
The x64 and x86 versions are now installed parallel (on 32bit systems only x86)


Bugfixes:
The representation of the GR values in the result monitor was revised.
Several minor errors in editing objects in the CAD have been fixed.
An error while editing the floor contours in combination with the UNDO function has been fixed.
Fixed some problems with corrupt luminaire data.
Fixed a problem with displaying rooms after importing IFC files.


New functions:
The lengths of manipulators are displayed in the CAD during construction.
The manipulators of auxiliary grid and the texture scaling now display the distances of the individual elements in the CAD.
The lengths and distances of manipulators can be edited directly in the CAD via "TAB"-key.
evo now distinguishes between two calculation types "Standard" and "Fast".
In "Fast" mode, only the visible part of the building calculated.
The entire calculation pipeline has been revised and accelerated. The calculation times are thereby reduced.
In addition, the calculation can be limited to calculation surfaces using the setting „Calculate surfaces only".
Min, max, average value and uniformity of luminance are now available in the output.


Improvements of existing features:
Output: In the room summary the floor based room height was replaced by the clear room height.
The graphical interface has been revised and improved. The tools are more compact and require less space.
The manufacturer selection can no longer be closed.
Canceling the calculation is now faster.
Loading and saving complex projects has been speeded up.
__________________
НИТПУ, кафедра Лазерной и Световой Техники

В России уровень маразма, превышает уровень жизни!!!
alkrymov вне форума   Ответить с цитированием